• Gypsum Natural Stucco Powder Production Line 20t/Year
  • Gypsum Natural Stucco Powder Production Line 20t/Year
  • Gypsum Natural Stucco Powder Production Line 20t/Year
  • Gypsum Natural Stucco Powder Production Line 20t/Year
  • Gypsum Natural Stucco Powder Production Line 20t/Year
  • Gypsum Natural Stucco Powder Production Line 20t/Year

Gypsum Natural Stucco Powder Production Line 20t/Year

Certification: ISO 9001:2008
Control Type: PLC
Crushing Degree: Ultra-Fine Mill
Automatic Grade: Automatic
Automation: Automatic
Method: Grinding, Calcining
Customization:
Gold Member Since 2006

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
DCIP052
Fuel
Natural Gas, Coal,Oil
Calcining Equipme
Vertical Kiln/Rotary Kiln
Type
Gypsum Plaster Making Machinery
Transport Package
Seaworthy Packing
Specification
ISO
Trademark
DCI
Origin
Hebei China
HS Code
84742090
Production Capacity
4 Sets Per Year

Product Description

Gypsum Natural Stucco Powder Production Line 20t/Year
Gypsum Natural Stucco Powder Production Line 20t/Year
Gypsum Natural Stucco Powder Production Line 20t/YearGypsum Natural Stucco Powder Production Line 20t/YearGypsum Natural Stucco Powder Production Line 20t/Year

What can we do for our clients?

For clients with specific requirement, we could provide the suitable solutions or make your plans more workable based on our overseas experience.
   
For  clients without detailed requirement, we would like to recommend our similar projects according to the climate and usage of the construction site.
   
For the value added service, we are capable of offering a impression picture to present the production line directly.

Product Description
Introduction of Gypsum Powder Production Line:

Decheng Group is incorporated of three companies: Hebei Decheng International Trade Co., Ltd, Hengshui Decheng Machinery&Equipment Co., Ltd and Qinhuangdao Dadi Engineering Co., Ltd.
 
Qinhuangdao Dadi Engineering Co., Ltd was founded in 2000, and it has 4 branch companies: survey company, foundation company, mapping company and earthwork company. It mainly engages in international contracting construction projects in African, Southeast Asia, and South Pacific countries. 
 
Hebei Decheng International Trade Co., Ltd, was founded in 2005 in Shijiazhuang city, mainly involves in supplying gypsum powder production line, gypsum board production line, gypsum block production line. In 2006, we had our workshops rent around Shijiazhuang to design and manufacture the non-standard machines of production lines, and in 2008, we founded our manufacture factory--Hengshui Decheng Machinery&Equipment Co., Ltd., together with our existing technical team, make us completely supply the complete set of service from design, manufacture, civil work, installation, commissioning to completion.
 
Hengshui Decheng Machinery&Equipment Co., Ltd has three workshops: machining workshop and casting workshop and electrical workshop. These three workshops mainly complete the manufacture and fabrication of machines and electrical control for production lines. In 2008, our company passed ISO9001 quality system certification. Our company has our complete professional team specialized in design, manufacturing, supply, installation and commissioning, and we can accomplish the matched electrical control system by ourselves. Moreover, our company owns our share-controlled processing base.
 
In recent years, our company has made achievements of building materials equipment projects in the Middle East, Central Asia and Eastern Europe, etc. And we have got highly praised from our clients for both product quality and after-sale services.
 
DCI,the turnkey solution service expert, your best choice!
Controlling Part Full Automatic / Semi-Automatic
Annual capacity Customized (30, 000-300, 000 Tons Per Year)
Calcining system Ebullition furnace
Rotary kiln
Fuel Natural gas, diesel, coal, heavy oil
Raw material Natural Gypsum Rock (Content of CaSO4@2H2O >80%.)
Desulfurization Gypsum
Phosphogypsum
Finished powder usage Gypsum board
Plaster powder
Setting time The Initial Setting Time: Shall Not Be Less Than 3 Minutes,
The Final Setting Time: Shall Not Be More Than 20 Minutes

 
1. Gypsum powder quality standard: in compliance with GB/T 9776-2008 
2. Main Technology(here take Nature gypsum rock as example)
Gypsum rock - first crushing -second crushing - grinding - calcining - aging -finished products (CaSO4.1/2H2O)
 
3.Payment conditions:
A.  Payment terms: 30% T/T in advance; 70%L/C or T/T
B. We can provide quality guarantee;
C. Kunlun bank account available to make convenient for Iranian clients

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now