• Full Automatic Gypsum Powder Machine with Top Quality
  • Full Automatic Gypsum Powder Machine with Top Quality
  • Full Automatic Gypsum Powder Machine with Top Quality
  • Full Automatic Gypsum Powder Machine with Top Quality
  • Full Automatic Gypsum Powder Machine with Top Quality
  • Full Automatic Gypsum Powder Machine with Top Quality

Full Automatic Gypsum Powder Machine with Top Quality

Certification: ISO 9001:2008, ISO 9001:2000, ISO
Control Type: PLC
Crushing Degree: Fine Grinding Machine
Automatic Grade: Automatic
Item: Gypsum Powder Machine
Production Scope: Product Line
Samples:
US$ 0/Piece 1 Piece(Min.Order)
| Request Sample
Customization:

Contact Supplier

Gold Member Since 2006

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
DCIP050
Rhythm
Flow Production
Service
Engineer Oversea Service
Control System
Full Automatic
Standard
China National Standard GB/T9776-2008
Raw Material
Natural Gypsum Rock
Mesh
80mesh-120mesh
First Setting Time
3-5 Minutes
Guarantee
One Year
Transport Package
Seaworthy Packing
Specification
Nonstandard
Trademark
DCI
Origin
China
HS Code
84742090
Production Capacity
4 Sets

Product Description

Full Automatic Gypsum Powder Machine with Top Quality
Full Automatic Gypsum Powder Machine with Top Quality
Full Automatic Gypsum Powder Machine with Top Quality
Full Automatic Gypsum Powder Machine with Top Quality
Full Automatic Gypsum Powder Machine with Top Quality
Full Automatic Gypsum Powder Machine with Top Quality


Introduction of gypsum powder machine with Top quality:

1. Controlling Part: Full Automatic

2. Capacity: Gypsum Powder Plant: 30, 000-300, 000 Tons Per Year

3. Fuel: Coal, Natural Gas, Heavy Oil, Diesel

4. Raw Material:
1)Gypsum Powder Plant:
A)Natural Gypsum Rock. Content of CaSO4@2H2O >80%.
B)Desulfurization Gypsum
C)Phosphogypsum

5. Quality Standard:
Gypsum Powder Quality Standard: GB/T 9776-2008
Gypsum Powder: 80-100mesh
The Initial Setting Time: Shall Not Be Less Than 3 Minutes,
The Final Setting Time: Shall Not Be More Than 20 Minutes

6. Main Technology
Gypsum Powder Plant(Nature Gypsum Rock)
Gypsum Mine - Crushing - Grinding - Calcining - Aging -Finished Products (CaSO4.1/2H2O)

 
Controlling Part Full Automatic / Semi-Automatic
Annual capacity Customized (30, 000-300, 000 Tons Per Year)
Calcining system Ebullition furnace
Rotary kiln
Fuel Natural gas, diesel, coal, heavy oil
Raw material Natural Gypsum Rock (Content of CaSO4@2H2O >80%.)
Desulfurization Gypsum
Dephosphorization Gypsum
Finished powder usage Gypsum board
Putty
Plaster powder
Quality standard 80-100mesh
The Initial Setting Time: Shall Not Be Less Than 6 Minutes,
The Final Setting Time: Shall Not Be More Than 30 Minutes
About DCI:
Hengshui Decheng Machinery & Equipment Co., Ltd, founded in 2008, is a comprehensive enterprise of machinery manufacture, research&development and investment casting. It has 218 staffs and 53 technical staffs including senior engineers, engineers and technicians. It covers 30, 000 sqm land, and has machining workshop, electrical workshop and precision casting workshop with complete sets of production and testing equipment. In 2008, it passed ISO9001: 2008 Quality Management System Certification. In early 2013, after on-site inspection and authentication by SGS, it became audited supplier of Made-in-China, and in May, 2013, it passed ISO/TS16949: 2009 "casting and machining for automotive parts" Quality Management System Certification. 
 
Our company specially designs and manufactures complete sets of building materials equipments, such as paper surface gypsum board production line, gypsum powder production line (natural gypsum and chemical gypsum), fiber cement board production line, calcium silicate board production line, cement production line, AAC block production line, stone production line, etc. Certainly we also supply single machines, spare parts and wearing parts for these production lines; At the same time, we produce some raw materials for the production lines, such as modified starch, foaming agent, glue, etc. 
 
Our company has well-experienced professional engineers and technical teams to ensure our clients with high-quality equipments. The well-skilled installation and commissioning team and high-quality process technologists provide our clients both at home and abroad with full set of technical services to make our clients "buy with reassurance and use with gratification". In recent years, our company has completed building materials equipment projects in the Middle East, Central Asia and Eastern Europe, etc, and has got highly praises for both product quality and after-sale services. 
 
Since established, we have been taking "human oriented, management strengthened, survival with quality, develop with technology" as company spirit, to provide customers with fittest products and win widely their praise. We, DCI, shall always insist on quality principle of "quality first, customer first, team work, continual improvement", and adhere to company philosophy of "honesty oriented, excellence pursue", to realize the aim of "united as one to make us successful and customer satisfied" and to provide better products and services for all old and new customers. "Let our brand remain in the customers' minds forever" is our quality commitment, and we wish to work together with all friends for common development. 
 
Warmly welcome all friends all over the world to our company!

Responsibility of Buyer and Seller
Prepared by Buyer
1.1 Machinery and tools for installation, commission and maintenance
1.2 Transportation tool:2 sets of forklifts
1.3 Power supply system
a. High-voltage power supply
b. Substation and distribution station
1.4. Water supply& storage and drainage system
1.5 Civil engineering: Building construction, equipment foundation(including pre-burying work), steel-concrete structure silos and pools.
1.6 Material used for making machine's platform and supporting frame of equipment
Provided by Buyer
2.1 Providing round-trip ticket and other transportation cost for the Seller's workers
2.2 Providing accommodation and all kinds of necessary extra charges for the Seller's workers during installation and commissioning and training period
2.3 Providing all necessary large tools for installation, such as crane, forklift, welder, acetylene& oxygen cutting machine, etc
2.4 Providing assistant workers to cooperate with the Seller's workers during installing according to the Seller's requirement
2.5 Usage permission for special equipment
Provided by Seller
2.1 Production equipment
2.2 Gypsum Board Production Line,
Providing installation guiding engineers and technical workers
2.3 Providing 1 team leaders and 1 interpreters
2.4 Providing equipment foundation drawings, general arrangement drawing of production line (layout plan, elevation drawing and side view drawing) within 40 days after receiving down payment
2.5 Providing equipments' operation manual during training
2.6 Providing main equipments' general assembly drawing, wiring diagram of control cabinets, PLC computer programs within 7 days after acceptance
2.7 The Seller is in charge of commissioning and training
a. Commissioning: the Seller shall send engineers and technical workers to plant site to do full-scale testing, and the Buyer shall also send assistant staff to cooperate with the Seller's people.
b. The Seller's workers in charge of commissioning will do performance operation, make on-site speeches and answer questions to Buyer's technicians and operation workers under training. During the whole process of testing, both sides shall work together. After Buyer's workers master operation technique, the Seller will hand over the whole running line to the Buyer's for operation and then the training work is finished.
2.8 Within one year after signing the Acceptance Certificate, the Seller shall provide technical consultation to the Buyer for free. If the Seller's people are asked to be on the site, the Buyer shall provide round-way tickets and accommodation abroad.

Environmental protection:
Main pollution sources:
Waste residue: Waste board and board edge cut down, etc.
Waste water: The sediment water left after the fan circulation use in the product process, from washing pool and toilet water.
Noise: mainly is 95Db(A)or so noise from the fan.
Dust: From mixing material and cutting board.
Disposal methods:
Waste residue and disposal: It does not pollute the environment and can be re-used afterreprocessing in gypsum powder production line.
Waste water and disposal: No industrial waste water. The living wastewater is drained into the plant sewage network, and the production wastewater from cleaning floor in the workshops can be recycled after the secondary sedimentation. And the water used in such equipment as fan can also be recycled.
Noise and deposition: Noise, which mainly comes from fan. Besides setting soft joints at the exhaust inlet and exhaust outlet. Set impedance complex mufflers at the exhaust outlet, which can low the noise as much as 30Db (A).
Dust and disposal: Dust collection devices will be equipped in the production process.

Send your message to this supplier

*From:
*To:
avatar Ms. Lee
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now