Introduction of gypsum powder production line with good service:
As professional manufacturer and supplier for building material production lines, we DCI mainly provide gypsum board production lines, gypsum powder production lines, and gypsum block production lines with different capacities according to client's requirements.
With our professional technical team, we can complete a series of work from design(mechanical and electrical), manufacture, supply, installation, commissioning to stabilized production,certainly we also provide the spare part supply service.
Till now, we've manufactured and supplied complete sets of machine lines to Russia, Oman, Uzbekistan,United Arab Emirates, Iran.
1. Controlling Part: Full Automatic
2. Capacity: Gypsum Powder Plant: 30, 000-300, 000 Tons Per Year
Gypsum Board Plant: 2 Million -30 Million M2/Year
3. Fuel: Coal, Natural Gas, Heavy Oil, Diesel
4. Raw Material:
1)Gypsum Powder Plant:
A)Natural Gypsum Rock. Content of CaSO4@2H2O >80%.
B)Desulfurization Gypsum
C)Phosphogypsum
5. Quality Standard:
1)Gypsum Powder Quality Standard: GB/T 9776-2008
Gypsum Powder: 80-100mesh
The Initial Setting Time: Shall Not Be Less Than 3 Minutes,
The Final Setting Time: Shall Not Be More Than 30 Minutes
6. Main Technology
1)Gypsum Powder Plant(Nature Gypsum Rock)
Gypsum Mine - Crushing - Grinding - Calcining - Aging -Finished Products (CaSO4.1/2H2O)
Controlling Part |
Full Automatic / Semi-Automatic |
Annual capacity |
Customized (30, 000-300, 000 Tons Per Year) |
Calcining system |
Ebullition furnace |
Rotary kiln |
Fuel |
Natural gas, diesel, coal, heavy oil |
Raw material |
Natural Gypsum Rock (Content of CaSO4@2H2O >80%.) |
Finished powder usage |
Gypsum board |
Putty |
Plaster powder |
Quality standard |
80-100mesh The Initial Setting Time: Shall Not Be Less Than 6 Minutes, The Final Setting Time: Shall Not Be More Than 30 Minutes |